FR NL EN

AG insurance – Charleroi

Renovation of the AG Insurance Building being composed of 11 floors mainly consisting in offices except the car park in the basement, technical rooms and a cafeteria.

 The building concerned by the works is to stay occupied, so the works will be conducted in several phases:

  • Renovation of the floors 5 to 7
  • Renovation of the trays 2 to 4 and the main technical facilities
  • Renovation of floors 0 and 1 as well as of the carpark (smoke removal).

 The appointments of the office of studies in this folder are mainly aimed at PEB studies electricity, sanitary, HVAC, and smoke removal.

 

The characteristics and specific elements are described underneath:                  

Energy: Global energy study to optimize the implemented facilities and thus insure a high energy standard

HVAC: Heath and cold distribution, air-treatment groups, terminal units, fluid distribution, local air-conditioning computer, car park smoke removal. 

Sanitary: Cold water distribution network and water for fire hazard, household and fecal waters evacuation, installation and connection of sanitary appliances.

Electricity: Replacement of the electrical boards on each floor, terminal electrical distribution, new lighting and emergency lighting, new electrical distribution by ground box, renovation and upgrading of normal and emergency electrical compliances, fire detection and access control.

 

Owner

AG Real Estate

Architect

Bureau d’architecture Bronckart et Jonas

Contractor

BEMAT

Cost

9,500,000 €

End of works: 2012

Surface

13,500 m²

pirnay engineering mentions légales
© www.orangebleu.be